Introduction
BLACKBERRY AIF strengthens its leadership in advanced technological infrastructure development with the expansion of its IberData Hub, a portfolio designed to meet the most demanding needs of artificial intelligence (AI), supercomputing, and high-capacity interconnection. This strategic ecosystem not only positions Iberia as a global technological hub but also redefines sustainability and operational efficiency standards. With a total consolidated capacity of 278 MW and a projection to reach 1 GW within the next three years, IberData Hub embodies innovation, sustainability, and long-term vision.

Córdoba and Vianos: Key AI and Hyperscale Projects
At the core of IberData Hub are two pivotal projects, GDC Córdoba AI 120 MW and GDC Vianos AI 100 MW, specifically designed to address the demands of the AI and hyperscale sectors. These facilities represent the culmination of advanced engineering and strategic vision, incorporating state-of-the-art technologies that optimize energy efficiency, reduce latency, and deliver exceptional performance for critical applications.

Room in data storage warehouse

New Projects: Strategic Pipeline Expansion
In addition to Córdoba and Vianos, IberData Hub is expanding its portfolio with new projects that strengthen regional connectivity and diversify its offerings:

  1. GDC Hormigos 5 MW
  2. GDC Alberche 18 MW
  3. GDC Cuerva 5 MW
  4. GDC Ardosa 6 MW
  5. GDC Lobera 14 MW
  6. GDC Las Camaña 10 MW
  7. GDC Las Valeras 9 MW

These centers, designed with a focus on colocation, complement the hyperscale projects and provide flexibility and scalability to the pipeline. Each is strategically located to maximize access to energy resources and ensure efficient interconnection with the major hubs of Madrid and Barcelona.

Investment and Growth: A Sustainable Strategic Vision
The IberData Hub portfolio represents a total projected investment of €10 billion to reach 1 GW of capacity within the next three years. To date, the consolidated portfolio will require an investment of €2.7 billion, reflecting a strong commitment to technological innovation and sustainability.

Each Green Data Center combines electricity from the Spanish national grid as the primary source with solar self-consumption installations, enhancing sustainability. Furthermore, these centers integrate advanced air cooling systems and waste heat recovery systems to generate additional energy, minimizing environmental impact without compromising operational efficiency. This approach ensures that IberData Hub meets the highest technical and environmental standards.

Interconnection: A Low-Latency Network for Iberia
IberData Hub’s interconnection strategy links centers in regions with high electrical capacity, such as Córdoba and Vianos, to the hubs of Madrid and Barcelona, addressing the energy constraints of these critical areas. Through dark fiber networks and a decentralized system, these centers ensure minimal latency and optimized connectivity, positioning Iberia as a strategic node for advanced technology.

Conclusion
The expansion of IberData Hub not only positions BLACKBERRY AIF as a leader in technological infrastructure but also redefines the limits of what is possible in sustainability and innovation. With a strong commitment to projects like Córdoba and Vianos and a strategy that integrates hyperscale, selective colocation, and advanced connectivity, IberData Hub offers a unique proposition for investors seeking to combine financial and technological impact with environmental responsibility.



#DataCenters #GreenDataCenters #IberDataHub #Hyperscale #ArtificialIntelligence #Supercomputing #CloudComputing #Sustainability #RenewableEnergy #TechInfrastructure #InvestmentOpportunities #Interconnection #IberiaTech #LowLatency #DigitalInnovation #AdvancedTechnology